Excavate drilled shafts in accordance with Item 416, "Drilled Shaft Foundations.". a. Obstructions. Remove obstructions to the proposed construction, including trees and other vegetation, debris, and structures, over the width of the excavation to a depth of 1 ft. below the bottom of excavation.
EXCAVATION AND BACKFILL FOR STRUCTURES
![whatsapp](/images/whatsapp.png)